Deposits
Charges for installation of meters include labor, equipment and materials and overhead.
An estimate of installation charges will be determined by the Utility and a deposit in that amount will be required prior to commencement of installation.
In the event the estimated charge is more than the actual cost of installation, the applicant will receive a refund. Should the deposit be less than the actual installation cost, the applicant will be billed for the additional charges.
Meter Size | Total Deposit |
---|
3/4" or 1" | $4,500 |
2" | $5,000 |
4" | $8,500 |
6" | $10,500 |
There is a fee for a water service disconnection from the mainline deposit.
Charges for disconnection include labor, equipment and materials and overhead.
An estimate of installation charges will be determined by the Utility and a deposit in that amount will be required prior to commencement of installation.
In the event the estimated charge is more than the actual cost of installation, the applicant will receive a refund. Should the deposit be less than the actual installation cost, the applicant will be billed for the additional charges.
Water Disconnection from the Mainline (Deposit): $4,000