Electric Standards and Forms

Electric Standards and Forms 



Resources

The following is an index of Electric Standard diagrams. Each link contains a full-page diagram.

Standard

Description

Date Approved/Revised

ED-1General construction notesFebruary 26, 2013
ED-2General notes for obtaining electrical servicesOctober 5, 2018
ED-3Conduit / duct bank cross sectionJuly 24, 2019
ED-4Grounding detail for UG primary structuresMay 8, 2003
ED-5Riser pole detailMay 8, 2003
ED-64'x4.5' single phase transformer pad and 17"x30" PBMay 8, 2003
ED-76'x8'6" transformer pad with 4'x7' enclosure by 42" deepMay 8, 2003
ED-88'x10' transformer pad with 4'x7' enclosure by 42" deepMay 8, 2003
ED-910'x12' transformer pad with 5'x8' enclosure by 60" deepMay 8, 2003
ED-10Switch slab boxMay 8, 2003
ED-11Street light handhole and cover - 12"x22"x18"March 6, 2019
ED-12Secondary pullbox and cover - 17"x30"x18"May 8, 2003
ED-13Pullbox and cover 2'x3'September 25, 2013
ED-143'x5' pullbox with spring assisted hinged coverMay 8, 2003
ED-154'x6' pullbox with spring assisted hinged coverMay 8, 2003
ED-166'x8'x7' vault with 4'x5' openingMay 8, 2003
ED-176'x10'x7' vault with 4'x5' openingMay 8, 2003
ED-186'x12'x7' vault with 4'x5' openingMay 8, 2003
ED-19Protective bollards for pad mount equipmentJune 22, 2020
ED-20Street lightMay 4December 15, 2021
ED-214'x5' traffic vault neck with concrete coverMay 8, 2003
ED-22Residential meter panel 200 amperes max. installation requirementsOctober 15, 2018
ED-23Temporary Overhead ServicesOctober 20, 2008
ED-24Temporary Underground ServicesOctober 20, 2008
ED-25Requirements for Customers with Photovoltaic GeneratorOctober 18, 2018
ED-26Clearance Requirements Around Pad Mount Transformer February 26, 2013
ED-27Requirements for Customers with Photovoltaic & ESSSeptember 4, 2018
ED-283'x5' Intercept Pullbox w/Spring Assisted Cover September 30, 2021
Banner AppBanner Display Application Kit January 20, 2022
Temp Service App
 Temporary Service Application
January 19, 2022