Azusa Rock Revised Conditional Use Permit

Conditional Use Permit & Reclamation Plan

Table of Contents & Executive Summary

1. GENERAL BACKGROUND INFORMATION

1.1 Purpose and Scope
1.1.1 Reclamation End Use Summary
1.1.2 Reclamation Phasing Summary
1.2 Azusa Rock History
1.2.1 Project Historical Milestones
1.3 Lead Agency Entitlements
1.3.1 Entitlement History
1.4 Applicant & Operator Information
1.5 Lead Agency Information
1.6 Legal Description  

2. LOCATION & ENVIRONMENTAL SETTING

2.1 Project Location
2.2 General Plan Designation
2.3 Zoning Classification
2.4 Mineral Resource Zone Classification
2.4.1 San Gabriel Production-Consumption Region
2.4.2 Azusa Rock Quarry Mineral Resource Zone Classification
2.5 Environmental Features
2.5.1 Site Access and Customary Vehicular Trips
2.5.2 Topography
2.5.3 Geology
2.5.4 Sediments and Soils
2.5.5 Surface Drainage & Delineations
2.5.6 Groundwater
2.5.7 Vegetation & Habitat
2.6 Site Visual Characterization 

3. MINING OPERATION PLAN
 
3.1 Proposed Date of Commencement
3.2 Mineral Commodity to be Mined
3.3 Estimated Annual Production
3.4 Estimated Total (Proposed) Production
3.5 Method of Extraction
3.5.1 Mining Method & Equipment
3.5.2 Processing & Transportation of Pit-Run Material
3.6 Method of Processing
3.7 Total Number of Acres Disturbed by Mining
3.8 Mine Phasing
3.8.1 West Slope Mining & Reclamation
3.8.2 East Slope Mining Cessation / Reclamation Commencement
3.9 Source of Topographic Mapping
3.10 Maximum Anticipated Depth of Mining
3.11 Drainage and Erosion Control
3.12 Points of Ingress and Egress to the Site
3.13 On-Site Roads
3.14 Perimeter Landscaping
3.15 Recreation Trail Relocation 

4. RECLAMATION PROGRAM

4.1 Proposed Reclamation End Use
4.2 Reclamation Phasing
4.2.1 Reclamation Phasing
4.3 Effects of Future Mining in the Area
4.4 Disposal of Mine Waste
4.5 Reclamation Performance Standards
4.5.1 Erosion Control and Drainage
4.5.2 Water Quality
4.5.3 Storage and Disposition of Equipment and Waste
4.5.4 Handling of Overburden and Topsoil
4.5.5 Backfilling, Regrading, Slope Stability & Recontouring
4.5.6 Health and Safety
4.5.7 Revegetation
4.5.8 Wildlife Habitat
4.6 Summary of Estimate of Reclamation Costs
4.7 Financial Assurance

5. CERTIFICATION

5.1 Lead Agency Certification
5.2 Statement of Responsibilities